Click on a photo to enlarge.
This Hennessey home had 2 inches of movement in their floors. This was causing cracks in the sheet rock and doorways. They called Vesta Foundation Solutions to fix the issue.
The Vesta Team member Josh Nation assessed the situation. His conclusion was that the home needed Smart Jacks to fix the issue.
The Vesta production team installed 3 Smart jacks in the basement. This allowed the floors to return to where they previously were.
This homeowner was experiencing settlement of the interior slab. The lowest point was 2 inches below the original position. Vesta Foundation Solutions used PolyLevel injection to permanently lift and level the floor back to it's original state.