Click on a photo to enlarge.
The before photo shows the sill plate that needs bracing for strength.
The during photo shows how we install the row of bolts in to the sill plate.
The after photo shows the way we bolt the bracket on to the footing, securing the sill plate to the footing.
The Before picture shows a Crawlspace under a home with sagging floors.
The After picture shows all metal Smart Jacks,and a metal cross beam, installed to correct this issue.
Cracked and failing retaining wall needed helical piers and push pier installation.
The Before Picture is a Excavated Hole next to a Sinking Foundation.
The After Picture Shows a Foundation Pier, that has been installed in the Excavated Hole.
This is a before photo of a gap between the floor and door jam
This is an after photo of the gap closed from installing smart jacks.