Click on a photo to enlarge.
The Before picture shows a home's deck that has soil movement and errosion Foundation issues.
The After picture shows the the area beneath the deck after soil was excavated. This picture also shows Foundation Piers have been attached to strengthen this deck.
The Before Picture is a Excavated Hole. Preparing to Install a Push Pier.
The After Picture shows the installed Pier.
The before photo shows the footing and sill plate that needs a UFP bracket installed for seismic retrofitting.
The after photo shows the UFP installed.
The Before Picture shows a Crawlspace, that has no Seismic Retrofitting components, strengthening the connection of this home to it's foundation.
The After Picture shows metal Universal Foundation Plates strengthening this connection.
The Before picture shows wood posts and cross beams in the crawlspace of a home with sagging floors.
The After picture shows new metal Smart Jack Posts and a Steel Cross Beam stabilizing a sagging floor.