True Level Concrete Ltd. installed 12 Push Piers to lift, and stabilize the foundation. This was successfully achieved and client was very happy. With structural repairs, property value is restored. This job was done both in rainy and dry weather. The Push Pier system is installed below grade and once work is done the backfill covers all the steel.
We were able to provide a fix to stabilze and lift the foundation of the Richmond house with Push Piers and PolyLEVEL.
The house was off level and we lifted the structure 3 inches. True Level Concrete Ltd, was able to do the work fast and efficiently. Client retained the resale value of the house and has the peace of mind.